POETRY ARCHIVE FOUNDATION

Where Words Inspire, Connect, and Transform

managerial accounting. Question 1: At an activity level of 8,800 units, Pember Corporation’s total variable cost is $146,520 and its total fixed cost…

by | Jan 11, 2025 | Posted Questions

managerial accounting. Question 1: At an activity level of 8,800 units, Pember Corporation’s total variable cost is $146,520 and its total fixed cost is $219,296. For the activity level of 8,900 units, compute the following values. Required: A. The total variable cost B. The total cost C. The average variable cost per unit D. The average fixed cost per unit E. The average total cost per unit Note: Assume that the activity level is within the relevant range. more question is attached below thanks ATTACHMENT PREVIEW Download attachment Image.pdf

POETRY ARCHIVE 

Welcome to a world where words dance and emotions take flight. Each poem here is a reflection of life’s beauty, struggles, and mysteries. Read, feel, and let the verses speak to you.